Battery Distribution Cluster for Twin Engine with Two Battery Banks Pièce numéro 715-S

OÙ ACHETER

Battery Distribution Cluster for Twin Engine with Two Battery Banks 715-S

The 715-S allows you to switch the house loads between port and starboard batteries. You can also use the selector switch to parallel the batteries .

  • Two battery banks